Real projects. Proven outcomes. Every entry documents our engineering-led approach to onshore cutting.

Featured Projects

Onshore, cold-cut, on schedule.

Excavator-mounted TQ saw cutting coated steel gas line — Gasunie, Netherlands.

In Action — Netherlands

ARVIGasunie

Arvi / Gasunie.

170

cuts completed

56

cuts per blade (only 4 blades used)

7 min

avg cut, 18" OD × 10mm WT

62

day project

First onshore scope in the Netherlands for national gas operator Gasunie — coated steel gas pipeline, cut cold, remotely, on schedule.

Note: 2 asbestos-coated cuts forced early blade retirement; remaining cuts averaged ~56/blade.

Excavator-mounted TQ saw at Barrow Island, Western Australia

Excavator-mounted TQ saw, Barrow Island WA — radio-controlled, zero hot work.

In Action — Australia

Liberty IndustrialChevron

Barrow Island.

100+

cuts per blade on GRE

2 min

average cut time

12 mo

year-long campaign

1

Class-A sensitive site

Year-long campaign for Liberty Industrial on a Chevron-operated Class-A environmentally sensitive island site — excavator-mounted, radio-controlled cold cutting accepted on one of the most environmentally controlled sites in the world.

TorqCut cold cutting a heavy structural steel section — no sparks, flame or heat-affected zone.

In Action — Confidential

Confidential

Cold Hull Cutting.

Confidential

cuts completed

Confidential

average cut time

Confidential

sections processed

Confidential

project duration

  • Remotely operated
  • Plunge cut through structural "stringer" sections
  • 100cm² in 20 minutes
  • Typical application: hull cutting

Controlled, low-vibration cold cutting of heavy structural steel with TorqCut — no sparks, flame or heat-affected zone, engineered to plunge-cut cleanly through internal structural members like hull stringers where other methods can't reach.

Client and performance figures withheld — confidential project.

TQ24 excavator-mounted TorqCut cold cutting steel piles at ground level.

In Action — Onshore

Confidential

Onshore Piling.

Confidential

cuts completed

Confidential

average cut time

Confidential

cuts per blade

Confidential

project duration

Excavator-mounted TorqCut cold cutting steel tubular piles on an onshore site — no hot work, no sparks, operator kept clear of the cut zone.

Client and performance figures withheld — confidential project.

TQ24 remote-operated TorqCut cold cutting a wellhead conductor casing.

In Action — Confidential

Confidential

Onshore Wellhead Decommissioning.

Confidential

cuts completed

Confidential

average cut time

Confidential

conductors cut

Confidential

project duration

Tracked, remote-operated TorqCut configured for onshore wellhead conductor cutting for a confidential client — fully cold, radio-controlled, with the operator kept well clear of the cut zone.

Confidential client — performance figures withheld at the client's request.

Excavator-mounted chopsaw vertically cutting a steel pipe section during a field trial.

In Action — Field Trial

Confidential

Vertical Cutting Field Trial.

Confidential

cuts completed

Confidential

average cut time

Confidential

cuts per blade

Confidential

trial duration

Field trial of the tracked, excavator-mounted chopsaw making vertical cuts through steel pipe sections — demonstrating cold, controlled cutting in a working yard environment.

Client and performance figures withheld — confidential project.